TEACHERS
GALLERY
PRICING
SIGN IN
TRY ZURU
GET STARTED
Loop
Audio
Interval:
5s
10s
15s
20s
60s
Play
1 of 16
Slide Notes
Download
Go Live
New! Free Haiku Deck for PowerPoint Add-In
Roman Centers
Share
Copy
Download
0
56
Published on Dec 05, 2015
roman
View Outline
MORE DECKS TO EXPLORE
PRESENTATION OUTLINE
1.
Roman Centers
by: Gavin Davis
Photo by
włodi
2.
roads (a)
Romans put a layer of big stones at the bottom of the road
little stones, pebbles,cement and sandmake the base
kerb stones held the surface in the paving stones and made a place for water
Photo by
infomatique
3.
buildings (b)
Romans lived in large buildings, 2 stories
the front doors opened to vestibule
Photo by
archer10 (Dennis) REPOSTING
4.
gods (d)
they were polytheistic, believed in more than one god.
main three gods were zeus, hades, and posideon
Photo by
mharrsch
5.
rise to power (c)
Julius Caesar was a policitior and military genaral
He conquered Gaul and governed it for 9 years
Photo by
Prof. Mortel
6.
government (e)
first branch were Senates and Potritians
he second is Assembly made of representitives
Photo by
sepa synod
7.
Latin (f)
before noon is AM also used in america
The year of the lord is AD
some Latin words are said in america also
Photo by
jaremfan
8.
Planets (g)
mercury is eight planet from the sun
eighth planet from the sun is Neptune
Venus is the Hotest planet
Photo by
markkilner
9.
(a) continued...
Cement mixed with broken tiles
holes were cut so it fitted tightly together
paving stones formed the surface of the road
Photo by
infomatique
10.
(b) continued...
rooms were small and dark but they were furnished
when its summer weather, Romans moved to the Country
some lived on the shores to the Meditteranean sea
Photo by
diepuppenstubensammlerin
11.
(c) continued...
Julius got stabbed in 44 BCE
Julius son Octovian got inperator which is the one who commands
the rise to power lead to peace called the Pax romana
Photo by
thisisbossi
12.
(d) continued...
Poseidon is god of the sea
Hades is god of the underworld
Zeus is god of the heavens
most gods lived on mt. olympus
Photo by
dullhunk
13.
(e) continued...
494 BCE the Phebians did protests
forum is used in the republic
the twelve tables were posted, converted alot to Roman life
Photo by
Stuck in Customs
14.
(f) continued...
PM is after noon
RIP means May he rest in peace
LB means pound
Photo by
o.tacke
15.
(g) the calendar continued...
Novem means nine (November)
Octo means eight (October)
Maia means Roman Goddeusses (May)
Septem means seven (September)
Photo by
brandoncripps
16.
Roman Numerals
V is five in roman numerals
I = 1 II = 2 III = 3 IIII = 4
X = 10
example - II + V + X = 17
Photo by
Yersinia
Friend of Haiku Deck
×
Error!