TEACHERS
GALLERY
PRICING
SIGN IN
TRY ZURU
GET STARTED
Loop
Audio
Interval:
5s
10s
15s
20s
60s
Play
1 of 11
Slide Notes
Download
Go Live
New! Free Haiku Deck for PowerPoint Add-In
Arch Bridge
Share
Copy
Download
0
337
Published on Nov 22, 2015
No Description
View Outline
MORE DECKS TO EXPLORE
PRESENTATION OUTLINE
1.
ARCH BRIDGE
GRACIE DOHRMANN, BRETT BULTMAN, CONNOR ALLAIN
2.
OUR BRIDGE-WITH MODIFICATIONS
3.
THE INFRASTRUCTURE
Span can cover the river length
Bridge can connect to the PanAmerica highway
Bridge is durable to handle wildlife
4.
TERRAIN
Sturdy; can hold large mass
Stable in severe conditions
Large span to cover mountainous areas
5.
ENVIRONMENTAL IMPACT
Our bridge can handle natural and developed land
Span can cover over different bodies of water
The bridge's structure won't affect the waterbed
6.
BENEFITS
Our bridge can hold a lot of mass
Large span increases stability
Affordable cost to build
Safe to use, sturdy
7.
PARTS COST
8.
FINANCIAL EFFICIENCY
Cost: 7,390 dollars
Low price of parts
Efficient total cost
5000\7390
Financial Efficiency=.66
9.
Untitled Slide
10.
STRUCTURAL
First trial: Held 9 blocks
Made modifications to increase stability
Second trial: Held 25 blocks
Total mass of bridge: 217.2 grams
.217 kg/2.5 kg = .087 structural effiency
11.
TEAM HATORADE
GRACIE DOHRMANN BRETT BULTMAN CONNOR ALLAIN
Friend of Haiku Deck
×
Error!